|
Sub-
ject
|
Develop-ment
Line |
S/W |
Contents |
Details
related to the integrated system |
Note |
| Subject
1 |
Design
|
RAMDES |
-The
Programs exclusively for the UG API
Based Automation of Injection Mould
Design |
- Standardization
of Drawing Numbers -Standardization
of the Design Process -Connection with
EDB and PDM |
Awarded
the Grand
Prize of the Minister of Information
& vision
munications |
| EDB |
MoldDB |
- Connect
the ordering data and engineering data |
- Connect
RAMDES, PDM, and CAPP
- Build a digital infrastructure
- Connect the processing condition database |
- |
| Subject
2 |
Equipmen |
JY-TMS |
- Equipment
management for small and medium sized
visionpanies |
- Connection
with UG CAM
- Connection with EDB
- Connect CAM process instruction |
Report
in
Plastic
magazine |
| CAM |
PREMA
NC
Post-
processor
|
- Conversion
considering the equipment change and
processing ability for optimal processing |
- Automatic
conversion during NC Data transmission
- Connection with JY
- TMS
- Preparation for verification based
on experiences |
- |
| Measurement |
PIMS |
- Generation
and execution of the measurement paths
for UG
- based measurement points |
- Connection
with Quality Control |
- |
|
Subject 3
|
Production
Management |
JY-DS |
- Scheduling
the production area through BOP |
- Connection
with Ordering -Schedules of requests
for design and CAM
- Site Data Collection |
- |
|
Subject 4
|
PDM |
IPDM |
- Revision
control and the connection with EBOM
and MBOM |
- Connection
with Ordering
- Design Scheduling Management
- Establishment of Digital Infrastructure |
- |